Ściany wspinaczkowe
Złoty Stok
The wall is built using an innovative technology of 3D laminate panels forming a single, seamless climbing surface without joints. This solution allows the entire structure to be delivered and installed at the client’s site within a single day.
Both the structural frame and the panels are fully assembled in our production facility and transported to the installation site as a complete unit. This eliminates potential installation errors and enables the structure to be erected in record time, especially in locations where extended on-site construction is not possible.
The seamless design further increases resistance to harsh weather conditions, which was particularly important for the client due to the demanding mountain environment, while also creating a clean and aesthetically consistent appearance. May 2025.